| Project: | New House |
| Location: | Crestwood Hills, Los Angeles, California |
| Description: | Re-building the house burned down by the Getty Fire in 2019 |
| Design: | 2021 |
| Floor Area: | 3,000 sf with Attached 2-Car Garage |
| Client: | Eiko Noble |
| Status: | Schematic Design Phase |
| Completion: | Unknown |
| Credit: | Becker Miyamoto, Land Surveyor Ralph Stone and Company Inc., Soil / Geo Engineer Murashige Onishi Engineering Co, Inc. Structural Engineer Obando & Associates, Civil Engineers |
