| Project: | Interior Renovation to Existing Condominium Unit |
| Location: | Century City, Los Angeles |
| Description: | Interior Renovation to Existing Condominium Unit on 8th floor Original Building designed by IM Pei in 1964 |
| Floor Area: | 1,300 sf |
| Completion: | 2025 |
| Client: | Mariko Cohen |
| Cost: | Withheld |
| Credit: | Title 24 / Energy: A&N Design Group Mechanical Plumbing Engineer: HWG Engineer Electrical Engineer: DS&A Engineer General Contractor: Embracing Green Sustainability, Inc. Alex Zai Cabinet: Kikosam USA / Osamu Hironaga |
