| Project: | “LIKE for LIKE” Fire rebuild |
| Location: | Malibu, California |
| Description: | Fire rebuild the house burned down in 2025 Palisades Fire |
| Floor Area: | 3,100 sf house with attached 2-Car Garage |
| Client: | MatWest Company |
| Cost: | Withheld |
| Design: | 2025 |
| Status: | Under Construction |
| Completion: | 2027 |
| Credit: | Gmon Surveying Inc. Certerra, Geotechnical Engineer Gray Stone Engineering Group, Civil Engineer A&N Design Group, Title 24 Energy Murashige Onishi, Structural Engineer ITM Construction, General Contractor |
